Robot Status
5/4/99
Mark Leininger



1. Location of extra AMU will be on rolling table locked to west end of D0 robot.

2. SCSI cables for Jon

3. Fire suppression system: D0 install will begin as soon as we can get lab to give the OK. It will take 2 weeks. CDF install will follow as soon as possible.