D0 Joint Projects Integration Page

d0 logocd logo

D0 Computing   Run II Joint Projects



This is planning, status and issues  for those diverse groups in CD and D0 working on integrating the D0 Run II Data Handling systems - hardware and infrastructure software. You should not believe the details of what you read - send mail to d0-integration@fnal.gov if you have questions. (Meetings are biweekly at 3 pm in FCC2A.)
 
 
System Monitoring  SAM Central Analysis Servers:
D0mino,D02ka,D0cha,
D0chb,d0test,d0nut
Enstore Network Database Systems:
D0ora1,D0ora2
Farms  Systems Status

 
 
Architecture Diagrams: Top Level Hardware Architecure (pdf) (ps) (ps)as of 10/11/99
CAS Architecture 8/99(ps) goal for 3/00 (ps) Work in progress (ps)
Commissioning Plans: Overall Plan; Database Machines
WBS: Central Analysis Systems: 08/99; Database Machines: 10/99; Enstore Systems: 10/99
Configuration Procedures: Network Configurations for CAS Machines (SGI Kernel Modifications)
ODS D0 Online Documents:: DLSAM Design Spec DSM Design Spec DLSAM Prototype Datalogger online help
d0olc: draft system design document draft dataflow diagram
Hypermail Archives: D0-integrate D0test-log